They’re Hereeee!
Please remember, Our RV Adventures is an Amazon affiliate. When you do your shopping through any of the Amazon links here, including the Search Amazon box in the right sidebar, it won’t cost you any more, but we’ll get a small commission on everything you buy. Just click on the Amazon link, then shop as usual. Thanks.
Plus, many of you are sharing our blog with others using the “Share this:” buttons at the bottom of each blog. Again, Thanks.
* * * * *
Finally!
About 20 till 6 this morning the bell rang and I stuck my head out the door expecting to greet one of the frack water guys who usually come in around 6am. But instead I found the point man for the Flowback team that was about an hour behind him.
And about 6:30 here they came. As it turned out, they weren’t really the Flowback crew yet, but more like the Flowback and ‘Anchor Down’ prep crew. So now it was back to our old routine.
I got dressed and went outside about 6:15 to get set up since we had stored away a lot of stuff under the canopy during our downtime, and also because of the four days of rain we just had. In fact as it turns out, the heavy rains may have been why everything Flowback was delayed since last week.
By 7am when I went inside to go to bed, 8 vehicles had come in, and by a little after 5pm we’d had a total of 56, a big jump from the None we’ve had for the last week or so. They were mostly bringing in equipment and tools
When we’ve got a new crew coming in like this, I always let Jan find out the particulars of what’s going on. The guys are always happy to chat up a pretty blonde who’s asking questions. Me, I usually just get ‘grunts’.
We were hoping that this might be a 12 hour job. but no, this is still a 24 hour gate. But the good news is that this Flowback will go at least a month before the Workover Rig comes in. Since we plan to leave in a little over three weeks to head back to the Houston area on November 22nd, this works out perfectly for us.
Yesterday Jan and I had talked about going out to dinner tonight, figuring it might be our last chance for a while. I mean, the Flowback’s gotta finally start sometime, right? But I guess we just went a day too far.
But not really, as it turns out. A little before 5:15, two trucks left that were the first two trucks in this morning. Since normally “First In, Last Out” means ‘Bosses’, I checked over the log and found everyone had left for the day, except for one truck. And since it was pretty overcast, there should have been lights on at the pad if anyone was still working there but it was dark down that way.
It’s not unusual for the crew to leave a vehicle or two onsite, so I stuck my head in the rig to tell Jan we might still be able to go out, but found her almost ready to bring out our dinner.
Bummer!
After we finished dinner, delicious leftovers from our Jalapeno Tree visit for Jan’s Birthday this past Sunday, I drove down to the pad to check things out.
And as I figured, the one missing truck was there, but no one else. Our window of opportunity had slammed shut.
But maybe tomorrow? We’ll see.
__________________________________________________
Thought for the Day:
According to a recent study, “nearly 10% of college graduates think Judith Sheindlin — commonly known as Judge Judy — is on the Supreme Court.
To quote someone, somewhere, “I fear for the Republic”.
asdfasdfd